For Any Query Call us
(08) 9472 9444

Vaughan

Vaughan

Marketing Coordinator
E: vaughan@cpdgroup.com.au
P: (08) 9472 9444

 

Website URL:

CPD Group experiences record growth in WA building market

 


West Australian owned and operated commercial building company CPD Group has its sights set on claiming a bigger piece of the State’s booming construction and maintenance market after a diversified approach to its services resulted in record growth over the past 18 months.

The past eight years have seen CPD Group undergo significant expansion, from a small maintenance contractor with only five employees to a key Western Australian construction and building services company employing in excess of 100 personnel.

Perth Zoo Eco Toilet Construction

 

Client: Perth Zoological Authority


  • Earthworks and preparation of site (following strict environmental specifications)
  • Involved an environmentally conscious and professional approach- works to be carried out during patron visiting hours.
  • Takes the phrase reduce, reuse, recycle literally with materials and methods used to minimise the environmental impact of construction.
  • Construction of three separate adjoining single storey structures designed to blend with their surrounding environment.
  • Installation of a number of sustainable products including- low flush toilet bowls, waterless urinals, low flow taps etc.
  • Installation of six water tanks with a total capacity of 76,000 litres used to service all plumbing and irrigation requirements for the surrounding landscaped area.
  • Photovoltaic cells, wind turbines and passive lighting have all been installed in place of traditional power methods.

 

ABC Broome Radio Studio Construction

Client: Australian Broadcasting Corporation (ABC)


  • Earthworks and demolition of site, including construction of concrete pad and car park;
  • Construction of new studios including all external and internal works;
  • Construction of cyclone approved steel structure, including projectile resistant windows.
  • Installation of timber acoustic partitions and external feature walls throughout building structure.
  • Installation of all Hydraulic, Electrical and Mechanical services;
  • Stormwater and drainage works including the installation of water tank and pumping facilities;
  • All associated site works, services and landscaping.