For Any Query Call us
(08) 9472 9444

Completed Projects

Kalamunda Hospital Surgical Redevelopment
ABC Broome Radio Studio

ABC Broome Radio Studio

Client: ABC

Architect: Brewster Murray

This modern, energy efficient building was designed to withstand severe cyclonic conditions, however equally important was its ability to be a functioning radio station for the Kimberley region. In ensuring this objective, CPD Group has installed acoustically engineered ceilings and walls throughout the buildings interior. The building is made up of four radio studios, each of

read more....

Kalamunda Hospital Surgical Redevelopment
Millen Primary School

Millen Primary School

Client: DTF-BMW

Architect: Oldfield Knott Architects

CPD Group recently delivered the Early Childhood facility for Millen Primary School. With the project taking on just over 40 weeks to complete, the new building is a single storey structure comprising of brick walls, concrete floors, steel framing and custom orb metal roofing. Brick walls generally are faced brick or block work finished, with some areas like toilets being rendered and tiled. Engineered structural steel supports the entire building and roof framing elements with the r

read more....

Kalamunda Hospital Surgical Redevelopment
Belmay Primary School

Belmay Primary School

Client: DTF-BMW

Architect: Patterson Group Architects

CPD Group was awarded the contract to construct the Belmay Primary School Library, Music Room and Arts and Crafts Facilities. With the project taking on just over 46 weeks to complete, the works comprised of a single storey structure with the construction consisting of brick walls, concrete floors, steel framing and custom orb metal roofing. Engineered structural steel supports the entire building and roof framing elements.

The new building is designed to be flexible, energy effic

read more....

Kalamunda Hospital Surgical Redevelopment
Wembley Police Station

Wembley Police Station

Client: DTF-BMW

Architect: Paradigm Architects

CPD Group was awarded the contract to undertake refurbishment and structural upgrades to the Wembley Police Station. Taking just over 19 weeks to complete, the project involved a complete interior structual upgrade, which consisted of extensions and additions to the exsisting building structure. These works involved transforming an outdated facility into a modern and sustainable buidling, capable of handling the demands of the Western Australian Police and the community. CPD Group undertook all

read more....

Kalamunda Hospital Surgical Redevelopment
Cloverdale Primary School

Cloverdale Primary School

Client: DTF-BMW

Architect: MPS Architects

CPD Group recently completed the contract of building a multipurpose Arts & Crafts, Music Centre and Undercover Area for Cloverdale Primary School. Taking just over 33 weeks to complete, the new building was designed to be flexible, energy efficient, of good architectural design and to minimise hazards to health and safety and to the environment. 

Considerable design effort has been put into achieving and maintaining thermal comfort in the new building by passive means.  This includes

read more....

Kalamunda Hospital Surgical Redevelopment
Curtin Primary School

Curtin Primary School

Client: Department of Education and Training

Architect: Oldfield Knott Architects

The construction of the early childhood centre for Curtin Primary School was completed in just under 20 weeks. This single storey building consists of brick walls, concrete floors, steel framing and custom orb metal roofing. The brick walls generally are faced brick or block work finished with some areas like toilets being rendered and tiled. Engineered structural steel supports the entire building and roof framing. The roof cladding consists of custom orb pr

read more....

Kalamunda Hospital Surgical Redevelopment
South East Metro Library and Kindergarten Block

South East Metro Library and Kindergarten Block

Client: DTF-BMW

Architect: Taylor Robinson Architect

The construction of the new South East Library and Kindergarten block was completed in 20 weeks. The project involved a new state of the art library with office and teaching facilites as well as a Kindergarten Block, completed with kitchen, office and earlychildhood facilities. External facilites included landscaped reticulated gardens, to a waterwise theme with natural and local vegetation.

The new building is designed to be flexible, energy efficient, of good architectural design

read more....

Kalamunda Hospital Surgical Redevelopment
Perth Zoo- Eco Toilet

Perth Zoo- Eco Toilet



Client:
Perth Zoological Authority

Architect: Chindarsi Architects

This state-of-the-art ecofriendly facility comprises of three separate, however adjoining, single story structures; consisting of a Parents Block, Disabled Toilet Block and a Unisex Toilet Block. The Eco-toilet takes the phrase ‘reduce, reuse, recycle’ literally, with the materials selected chosen to minimize the environmental

read more....

Kalamunda Hospital Surgical Redevelopment
Byford Hall

Byford Hall

Client: DTF-BMW

Architect: Terry Farrell Architects

The construction of the Byford Hall was completed in just under 52 weeks. The additions include a new community area and foyer, new storerooms, office space, improved acoustics, security and photovoltaic cells, painting, and improvements to the toilets and kitchen. There is an extra 80 square metres which has the potential for more user groups to use the facility.

Considerable design effort has been put into achieving and maintaining thermal comfort in the new building by passive me

read more....

Kalamunda Hospital Surgical Redevelopment
Pinjarra SHS Science Block

Pinjarra SHS Science Block

Client: DTF-BMW

Architect:

 

Pinjarra

read more....